Posters

Equipment, testing techniques, systems, as well as summaries of events are presented in brief on our posters. The download link is provided for download of high resolution PDFs.
Please note that KARL DEUTSCH is the copyright holder of the posters and these must not be used, copied or distributed without our prior permission.
The content of the poster has been carefully compiled, nevertheless errors and mistakes may be possible. Therefore, liability claims arising from the use of the posters are generally excluded.

Miscellaneous (Industrial Fairs, Congresses, Events, Product Portfolio)

ECHOGRAPH Ultrasonic Testing: Manual · Semi-Automatic · Fully Automated
UT Practical Examples

Format: DIN A0
Language: English

Anwendungen im Industriesegment „Eisenbahn“
Magnetpulverrissprüfung / Ultraschallprüfung

Format: DIN A0
Language: German

Non-Destructive Testing Since 1949
KARL DEUTSCH Portrait

Format: DIN A0
Language: English

Bergische Sehens­würdig­keiten, Kultur und Industrie
KARL DEUTSCH – Eine Firma aus Wuppertal

Format: DIN A0
Language: German

Nondestructive Material Testing Since 1949
KARL DEUTSCH History

Format: DIN A0
Language: English

Products, People and Events 2014 / 2015
KARL DEUTSCH Milestones

Format: DIN A0
Language: English

Produkte, Personen, Events 2012 und 2013
KARL DEUTSCH Meilensteine

Format: DIN A0
Language: German

Anwendungen
Übersicht Messgeräte

Format: DIN A0
Language: German

Basic Knowledge: Teaching Posters on the Methods of Non-Destructive Testing

Ultraschallprüfung

Format: 60 cm x 80 cm
Language: German

Ultrasonic Testing

Format: 60 cm x 80 cm
Language: English

Ultraschallprüfköpfe

Format: 60 cm x 80 cm
Language: German

Magnetpulver-Rissprüfung

Format: 60 cm x 80 cm
Language: German

Magnetic Particle Testing

Format: 60 cm x 80 cm
Language: English

Eindringprüfung

Format: A0
Language: German

Penetrant Testing

Format: A0
Language: English

ECHOGRAPH: Ultrasonic Testing with Portable Instruments

Digitales Ultraschallprüfgerät
ECHOGRAPH 1095

Format: DIN A0
Language: German

GEKKO: Ultrasonic Testing with Phased Arrays

Prüfung von Elektro­schweiß­muffen mit TFM
MANTIS / GEKKO Phased-Array-Prüfgeräte

Format: A0
Language: German

Inspection of Electrofusion with TFM
MANTIS / GEKKO PAUT Flaw Detectors

Format: 60 cm x 80 cm
Language: English

Portable Phased Array Flaw Detector for High-Performance Defect Detection

Format: DIN A0
Language: English

Basic Principles and Applications
ECHOGRAPH Phased Array Ultrasonic Testing

Format: DIN A0
Language: English

Ultrasonic Testing of Seamless Tubes with Phased Array
ECHOGRAPH-RPTR tube testing portal

Format: DIN A0
Language: English

Portables Phased Array-Gerät
GEKKO

Format: 60 cm x 80 cm
Language: German

Portable Phased Array Unit
GEKKO

Format: 60 cm x 80 cm
Language: English

ECHOGRAPH: Ultrasonic Testing Systems

Ultrasonic Testing of LSAW Pipes (Longitudinal Weld)
ECHOGRAPH-SNUL

Format: 60 cm x 80 cm
Language: English

Online and Offline Ultrasonic Testing of ERW Pipes
ECHOGRAPH-SNHF

Format: 60 cm x 80 cm
Language: English

Magnetic Particle and Ultrasonic Inspection of New Railway Wheels
DEUTROMAT & ECHOGRAPH Railway Wheel Test

Format: A0
Language: English

Automated Ultrasonic Testing
ECHOGRAPH Testing Systems

Format: 60 cm x 80 cm
Language: English

Automated Ultrasonic Testing Systems
ECHOGRAPH Bar Testing

Format: 60 cm x 80 cm
Language: English

Automated Ultrasonic Testing of Heavy Duty Steel Bars
ECHOGRAPH-RPTS

Format: 60 cm x 80 cm
Language: English

Prüfbrücke für HF-Rohre – Testing Bridge for ERW-Pipes
ECHOGRAPH SNHFB

Format: 60 cm x 80 cm
Language: English

Ultrasonic Testing of Helically Submerged Arc Welded (HSAW) Pipes
ECHOGRAPH BAPS & SNUS

Format: 60 cm x 80 cm
Language: English

Ultrasonic Testing of LSAW Pipes (Longitudinal Weld)
ECHOGRAPH-SNUL

Format: 60 cm x 80 cm
Language: English

UT-Prüfelektronik
und Auswertesoftware

Format: 60 cm x 80 cm
Language: German

Ultraschallprüfköpfe / Ultrasonic Probes
ECHOGRAPH

Format: 60 cm x 80 cm
Language: German / English

ECHOGRAPH: Ultrasonic Testing Systems (Phased Arrays)

Phased Array Inspection of Bars
ECHOGRAPH-STPS-PAUT

Format: 60 cm x 80 cm
Language: English

ECHOMETER: Wall Thickness Gauges

Highest precision for ultrasonic wall thickness measurement
ECHOMETER 1077

Format: DIN A0
Language: German

Measure through coatings
ECHOMETER 1076 TC

Format: DIN A0
Language: German

LEPTOSKOP: Coating Thickness Meters

Individual Coating Thickness Measurement with System
LEPTOSKOP 2042

Format: DIN A0
Language: German

FLUXA and KD-Check: Chemical Products

Testing Equipment for Surface Crack Testing
FLUXA and KD-Check

Format: 60 cm x 80 cm
Language: German

Flaw Indication with Magnetic Particle Inspection and Penetrant Testing
Physical and Chemical Influence Factors

Format: A0
Language: English

DEUTROFLUX / DEUTROMAT: Magnetic Particle Testing

AutoDR in der Magnetpulverprüfung

Format: DIN A0
Language: German

Magnetic Particle and Ultrasonic Inspection of New Railway Wheels
DEUTROMAT & ECHOGRAPH

Format: DIN A0
Language: English

Detection of Surface Cracks in Magnetic Materials
Magnetic Particle Crack Detection

Format: 60 cm x 80 cm
Language: German

Detection of Surface Cracks in Ferromagnetic Materials
Magnetic Particle Crack Detection

Format: 60 cm x 80 cm
Language: English

Kurbelwellen-Rissprüfung (MT) / Crankshaft Testing (MT)
DEUTROMAT Turn Table

Format: 60 cm x 80 cm
Language: German / English

KD-Check: Dye Penetrant Testing Systems

Automated, Liquid Penetrant Inspection with high Throughput and high Process Reliability
KD-Check Dye Penetrant Testing Systems

Format: DIN A0
Language: German

Automated Liquid Penetrant Inspection with high Throughput and high Process Reliability
KD-Check Liquid Penetrant Inspection Systems

Format: DIN A0
Language: English

PT-Prüfplätze & Prüfanlagen / PT Stations & Systems
KD-Check-Systems

Format: 60 cm x 80 cm
Language: German / English